labour required for 1 cum concrete.

How many Bags of Cement are Required in 1 cum of M20 Grade ...

Jun 22, 2020· Material Estimation for M25 Grade Concrete -How to Calculate Quantity of Cement Sand and Aggregate? - Duration: 15:27. Civil Engineers 2,511 views

How to Estimate Concrete Costs

Nov 20, 2019· If you are placing concrete over soil, you will need to grade or prepare the surface for the concrete. Pricing for this can include expenses related to grading, compacting soil, excavating, trenching, and other components.As a good average, you can use $65 per hour of work needed to prepare the surface, assuming that the surface is more than 75 percent leveled and no special work is needed to ...

how many labour is required for 1cum of concrete?

how many labour is required for 1cum of concrete? .. Answer / sathesh.b.nama 3CUM/DAY/ MASON WITH 1 HELPER CAN DO RCC & 5CUM/DAY/MASON WITH 1 HELPER CAN DO PCC..IS NORMAL PRODUCTIVE NORMS OFA A MASON NOW-A-DAYS

Labor Requirement for Various Construction Works

Labor Requirement for Various Construction Works. There are different types of labors that are required for the construction: Skilled labor; Semi-skilled labor; Unskilled labor; All these types of labors have different skills and different salaries. Their optimum use in every work in construction is essential to minimize the construction cost.

Civil Work - CONCRETE GRADE: M5 = 1:4:8 M10= 1:3:6 M15 ...

Oct 20, 2014· 03. 1 Cum 35.32 Cft 04. 1 Inch 2.54 cm 05. 1 sft 0.09Sqm 06. 1 Acre 0.04 Hectare 07. 1 Hectare 2.47 Acres 08. 1 Cft 0.028 Cum 09. 1 Feet 12.00 Inch 10. 1 Feet 0.305 M 11. 1 Cum 1000.00 Litre. UNIT WEIGHT: 01. Concrete 25 kN/m3 02. Brick 19 kN/m3 03. Steel 7850 Kg/m3 04. Water 1000 Lt/m3 05. Cement 1440 Kg/m3 06. 1Gallon 4.81 Litres 07. Link 8 ...

How much labour and mason are required for 10 Cu.M. RCC ...

Jul 21, 2018· Mason 3.7 days Labour 35 days Water carrier 13.9 days Bar bender 1 day/ 100 kg Mixer operator-0.72 days Vibrator operator0.72 days Day means 8 hours with lunch break of …

How to Calculate Cement, Sand and Aggregate required for 1 ...

So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose Bulk Densities) method is an accurate method to calculate cement, sand and aggregate for a given nominal mix concrete.

How to Calculate Quantities of Cement, Sand and Aggregate ...

In the step 3 of "How To Calculate Quantities Of Cement, Sand And Aggregate For Nominal Concrete Mix (1:2:4)" you have calculated that: 01 cum of concrete will require Cement required = 1/0.167 = 5.98 Bags ~ 6 Bags Sand required = 115/0.167 = 688 Kgs or 14.98 cft Aggregate required = 209/0.167 = 1251 kgs or 29.96 cft

what is the weight of concrete for 1 cum?

Answer / nantha. M15 -2225 kg/cum M20-2300 kg/cum M25-2375 kg/cum M30 and above 2400 kg/cum

Analysis & Rates, Analysis and rates for construction work ...

The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. ... In well organized work less labour is required. ... 45cum for 100 cum. 10. Materials for cement concrete 1:2:4 . Ballast or grit 88%. 88cuft for 100cuft. 88cum for 100 cum . Sand 44%.

How much steel is required for 1 cubic meter concrete? - Quora

You may require the following quanties of steel reinforcements per one cum of cement concrete which is expressed in kg:- 1.Column footings 75 kg use 10 or 12 mm dia rods 2.Grade beams 100kg use 12,16 mm dia rods -85%; 8 and 6mmdia rods -15% 3.Plin...

how much cement,sand,aggregate will use for 1 cum in ratio ...

Answer / lakshmanarajan. The Ratio is 1:2:4 Total = 7 Ingredients of this Mixture is = 1.57 So the qty of Cement is = (1/7) x 1.57 = 0.224 cum Volume of cement in i cum = 1440kg

how many average of shuttering in one cubic meter concrete

Answer / mrinal bose. Approximate Shuttering value 1:8.88 it is standard shuttering volume. The standard column size 300 mm X 450 mm, Slab thk is 125 mm, plinth beam 230 mm X 350 mm, Beam/ slab beam 230 mm X 450 and foundation shuttering will less then …

Productivity in Construction

cubic metre of concrete poured. The two most important measures of labour productivity are: • the effectiveness with which labour is used in the construction process; • the relative efficiency of labour doing what it is required to do at a given time and place. Examples of the first measure are the labour dollars required to produce a square

Methods of Measurements and Units of Civil Construction Works

1. Measurement shall be made for finished item of work and description of each item shall include materials, transport, labour, fabrication tools and plant and all types of overheads for finished the work in required shape, size and specification.

Labour Requirement & Output Per Day for different Civil Works

In a project budget, the toughest thing is to identify the source of material and required manpower calculation. We have to deploy adequate manpower to complete a certain activity without any chaos. In this post, we had listed out the approx labour requirement for civil works and also Labour output per day for different works.

1 Cum Brick Work CM 1: 6 - How Many Bricks,sand,Cement ...

Answer / hussain. Volume of 1 Brick = 0.230*0.115*0.075 = 0.002 So No of brick req for 1 m3 = (1/0.002) = 500 Nos 1.7 bag of Cement required 0.31 cum sand required for 1 cum of brickwork

ArchiDesigners : Calculation of material and labour ...

Sep 16, 2014· In the above table, material and labour requirement for 1 Cube of rubble masonry work have been indicated based on the field experience and building schedules of rates. In this calculation, it is necessary to add 5-10% of wastage for sand.

Quantity and Rate Analysis for Reinforced Concrete ...

=8.07 bags of cement. b) Volume of Sand required: Volume of sand required = = 0.42 m 3 of sand. c) Volume of Coarse Aggregate Required Volume of Coarse Aggregate = = 0.84 m 3 of coarse aggregates. d) Estimation of Reinforced Steel: Quantity of steel required depends on components of structure, i.e. slabs, beams, columns, foundations, roads etc.

Rates Analysis For Calculating Material and Labour for ...

Sep 13, 2014· Rates Analysis For Calculating Material and Labour for building works 1. By .Ali Hyder Gadhi 2. ANALYSIS OF RATES • To determine the rate of a particular item of work from a quantities of materials and labours required and their costs • The rates of materials and labour are changing from place to place, therefore the rates o different items of work also changes from place to place

Thumb rule of formwork quantity for High rise buildings.

As per the data the calulation goes like for 1 Cum Concrete the requirement of shuttering is 11.71813333 Sqm On concretable area for 1 Cum Concrete the requirement of shuttering is 3.767038414 Sqm On floor plate area Shuttering required for 1 Sqm on BUA 3.110701842 Sqm On BUA Concrete Coefficient / Sqm 3.767038414 Posted: 1810 days ago

How much labour is required for excavating the soil of 1 ...

Dec 23, 2017· A good man can dig a cube of soil out in a morning. If harder soil, such as heavy clay, it takes all nearly day. A JCB will dig a cube out in a few minutes. A 300 PC in a few seconds.

How many kg of steel reinforcement in one cubic meter ...

It all depends on the type and sizes of the steel used. It also depends on the load that the concrete has to take at certain points. 7865kg is the weight of a cubic meter of steel. Typical ...

RCC Calculator | Estimate Cement, Sand, RCC Online Calculator

Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree.com, you can also …

How to calculate the Labor, equipment, shuttering & rebar ...

1- material. 2- labour charge. material means :1- concrete price and that depend of wat element u want to cast it sub or super struc. and is it required green concrete or SRC or OPC approxmately it will be around AEd255 if its green concrete. oAed 215 if it SRC for mix 400 kg grade 40 n. also pump charge will be assume 50/m3

How many labours are required during the concrete pouring ...

Please resubmit the question with relevant details such as whether it is a building slab, beams and column stubs pour and if so at what floor level or is it a bridge pier or deck slab in a river with water and what is the pouring arrangement and o...

Labour Requirement for 1cum of RCC - Civil Snapshot

Labours required are presented in terms of days required by particular labour to complete its work for the given quantity of concrete. Following are the various labours required: Mason: As per Standard Schedule of Rates and Analysis of Rates, One mason is required for 0.37 days. Labours: One Unskilled labours required for 3.5 days. Water carrier:

HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER …

Answer / sjtbehera. For M20 Grade conc. Head mason - .05 x Rs 200 = Rs 10.00 Mason - .3 x Rs 190 = Rs 57.00 Labour - 2.5 x Rs 90 = Rs 225 _____ Total amount - Rs 292.00

What is the procedure to calculate cement bags in 1 cubic ...

01 batch (1:2:4) produces = 400/2400 = 0.167 cum of concrete No. of bags required for 01 cum of concrete = 1/0.167 = 6 bags From above, if the concrete mix is 1:2:4(by volume), to get a cubic meter of concrete we require

RATE ANALYSIS OF CONSTRUCTION ITEMS

Rate analysis of an Item is defined in terms of 4 parts namely, Material, Labour, Machinery and Overheads. There are no limitations on number of items or even materials which can be entered. The rate analysis of various types of projects is supplied along with the software as a sample data. Multiple Units for a single material can be defined.

Concrete Mix Design – M 20 Grade Of Concrete

Concrete Mix Design – M 20 Grade Of Concrete ... 1. REQUIREMENTS a) Specified minimum strength = 20 N/Sq mm. b) Durability requirements i) Exposure Moderate ii) Minimum Cement Content = 300 Kgs/cum. ... aggregate for m-25 concrete for 1 cum. Reply Link. nandhini.k January 5, 2012 at 1:07 am.

How To Calculate Cement Bags In 1 Cubic Meter?

Dec 21, 2016· How To Calculate Cement Bags In 1 Cubic Meter Procedure To Calculate Cement Bags In 1 Cubic Meter: ... =0.0347 cum. ∴ No. of cement bags required in 1 cubic meter = 0.2171/0.0347 = 6.25 bags. ... Any one please send mix design for m30 grade of concrete using 1%, 1.5%,2% crimped Steel and poly propylene fibres. Farjad January 25, 2018 at 3:19 ...

LABOUR-BASED METHODS AND TECHNOLOGIES for …

Part 3 Labour-based methods for materials manufacture 1. Precast Concrete Products, Bricks and Block Making Other sections to be included when developed Part 4 Labour-based construction technologies 1. Labour-based open channel flow technology 2. Rubble masonry concrete dam construction technology 3.